Skip to content
Fall Savings Event — 15% off everything, now through October 31. No code needed.
15% off everything — ends Oct 31

Free shipping for subscribers · Sign up free

Free Range - 3/4 Inch Nylon Training Leash - for Large and Medium Dogs - Long Lead with Handle - Great for Training, Play, Camping, or Backyard (50 Ft, Orange)

Original price $0.00 - Original price $0.00
Original price $0.00
$85.04
$85.04 - $85.04
Current price $85.04
Size: 50 Foot

Product description

Trainer Handle

The classic trainer handle is ideal for fully-trained dogs and peaceful environments

Max Comfort Handle

The max comfort handle gives you more control without sacrificing comfort thanks to an extra layer of padding.

Max Grip Handle

The max grip handle allows you to hold on as tight as you need. Great for pups who pull and busy urban settings

Velcro Coil System

Easily roll up and stow unused slack using the integrated velcro coil system.

  • ULTRA DURABLE TRAINING LEAD: This long leash for dog training is made from strong, durable nylon that is softer and stronger than cotton leashes. Perfect for training, outdoor activities, and even the beach!
  • COMFORT AND EASE: Unlike polypropylene leashes, our long leash for dogs outside doesn't have sharp edges that could scrape your hands while reeling in. All stitching is reinforced and the nickel plated clip swivels to resist twisting or tangling.
  • CHOOSE YOUR HANDLE: Our extra long dog leash is available with a sturdy foam handle for ultimate comfort, a rubber molded handle for a strong grip with dogs that pull, or a standard nylon handle for lightweight on-the-go travel.
  • VERSATILE USE: A great training leash for large dogs or medium dogs for off-leash dog training or training in the backyard. As well as for hiking, camping, training, hunting, recall training, outdoor play with tennis balls, and swimming!
  • GREAT FOR ANY BREED: Whether you need a puppy training leash for small dogs or more control over a medium or large dog, our leads are perfect for any pup. Available in lengths between 15 and 100 ft, simply clip to their Leash Boss collar or harness!
Shipping & Delivery

Standard shipping is $5.95 flat — one rate, any order size.

Subscribers ship free. Sign up with your email and we'll send you a free-shipping code you can use on every order. Join free here.

Orders are processed within 1–3 business days. You'll get a tracking number by email as soon as your order ships.

United States: 3–7 business days after dispatch (most orders arrive within 5–10 business days of purchase).
Canada & international: 7–20 business days, depending on destination and customs.

If your U.S. order has not arrived within 10 business days, contact us and we'll send you a 10% discount code for your next order. If tracking stalls for 10 business days or the carrier confirms the package is lost, we'll send a free replacement.

Full details: Shipping Policy

Returns & Refunds

30-day returns. Not happy with your order? Request a return within 30 days of delivery. Items should be unused, in their original packaging, with tags attached.

Arrived damaged, defective or wrong? Contact us within 7 days with photos and we'll send a free replacement or a full refund — no return shipping cost and no restocking fee.

For change-of-mind returns the customer covers return shipping and a 3% restocking fee applies. Approved refunds are issued to your original payment method within 5–7 business days.

Questions? Email info@browseget.com — we reply within 24 hours. Full details: Refund Policy